The foundation around a church building failed and they Called The Pro's At J-Pro! We were the lowest bidder for this project by 35%. We completed the job within 21 days. The linear footage was approximately 985 feet. We took care of the landscaping without loosing one plant or bush.
We also installed a perforated tubing around the perimeter prior to the backfill. We then sloped the perforated tubing away from the church and installed it into an existing dry-well. The architect as well as the project manager for this job were very happy with the quality and the speed of the completion of this project.