This is terrible news for the church and for the community.  On June 11, 2006 someone set fire to the church.  We are sorry for the church and for the community. 

         

We are in the process of restoring the church.  We should be completed within the next couple of weeks.

This photo shows how we carefully protected all of the items that did not get damaged from the fire while we were in the process of restoring the beautiful oak pews and the rostrum.  This is all hand done in house by our men.  We are then spraying the stain and the polyurethane to achieve the smoothest finish.

This is in the hallways of the church.  We removed the damaged ceiling grids and installed new grids and ceiling tiles.  We removed and replaced the sheetrock that was badly damaged.  We furnished and installed new chair rail oak moldings (stained and polyurethane all in house).  We spackled, primed and painted the entire walls, metal doors and frames.  We furnished and installed new sisal wall covering (the carpet on the walls).  We at J-Pro Contracting Inc. are very proud to be part of the restoration of this beautiful church.

Remember Call The Pro's At J-Pro!

Jim Prousalis/President e-mail: jim@j-proinc.com

Donna Prousalis/Office Manager e-mail: donna@j-proinc.com